The project:
To refurbish the
outdated kitchens and install new equipment on two floors of a
Grade II Listed Town Hall to cater for two function rooms capable
of holding up to 200 guests each. The electrical, mechanical and
ventilation system also needed bringing up to current
standards
The
result:
The electrical and mechanical
services were stripped back to source and new electrical
distribution boards were installed for the kitchen. This allows for
easy isolation and identification of the circuits.
To ensure the highest
standards of hygiene new wall cladding, flooring and ceiling were
installed. A PVC wall cladding system was provides a virtually
joint free finish and as it was formed on site it is an exact fit
for the walls to be covered. This finish is extremely easy to clean
and requires no maintenance. The same joint free hygiene standards
were applied to the floor in the form of Altro slip resistant
flooring with coved skirting for easy cleaning. The ceiling is a
simple plastic faced plasterboard suspended system that is easy to
clean and provides access to the area above.
New energy efficient
catering equipment was installed beneath a new ventilation canopy.
To comply with gas safety regulations, the new canopy has integral
extraction and temperature controlled fresh air supply to ensure a
safe working environment. The flow of gas is controlled via a gas
solenoid valve and interlock control panel to conform with Gas
Safety Regulations.
The response:
Mark Evans, Project Surveyor for
Bassettlaw Council:
"The project was professionally
managed by BETTAquip, the works were completed to a high standard,
on time and within budget."
To discuss how BETTAquip can improve
your catering facilities call Andy Bettany on 01543 308610 or email
via info@bettaquip.com